| @ |
|
| The Quality Assurance Division Approach |
|
|
|
|
|
 |
An ISO project team was formed within the company in 1998. The ISO9001 certification was obtained after a yearfs hard work, and without the assistance of external consultants. It is a result arrived at through a fundamental revision of the companyfs quality system. On top of this, the ISO14001 certification was obtained for the Ibarakii plant in October 2005. |
|
| Quality Reporting Conference |
|
|
 |
The first Saturday is at Kikuwafs Quality Reporting Conference day in every month. The results of month-long improvements and further challenges are brought to the table and heavily debated in line with the company policy of eCreating reliable products from the customerfs standpoint.f |
|
| Comprehensive Range of Equipment |
|
|
 |
We have various equipments such as CMM(Coordinate Measuring Machine), the tensile testing machine, etc. |
| |
|
 |
In-House spectrometer to be secured material contents in order to secure our products. |
| |
|
|
|
Simply email us using these forms - for everything from quotes to product information.
|
|
 |
|